SOP FOR PROCEDURE FOR DESTRUCTION OF WASTE MATERIAL
PURPOSE: To lay down a procedure to be followed for the Destruction of Waste Material.
SCOPE: This SOP is applicable for the procedure involved in Destruction of waste Material Generated in production department.
RESPONSIBILITY
Preparation of SOPs: Officer QA Department
Checking and Review of the SOPs: Officer QA Department
Approval of the SOPs: Executive QA Department
Authorizing of SOP: Head QA/Designee
Compliance of SOP in Production: Head Production/ Designee
ACCOUNTABILITY: Head QA and Production Head shall be accountable for the implementation and compliance of the SOP.
PROCEDURE:
Collect all the waste and rejected material like waste powder, tablets, capsule, vial, Bottles, carton, shippers, rejected labels, Blister & Strip etc.
Now segregate and collect the waste and Rejected powder, powder from Vial and bottle tablets and capsules in a plastic container and add the potable water.
Allow to Sediment the Solid Material on bottom.
Drain the water and collect the slurry in poly bag.
Affix the “REJECTED” Label and send it for disposal in Effluent Membrane Filtration System.
Collect Empty, Broken and Rejected vial, Ampoules and Glass Bottle in Separate poly bag and affix the “REJECTED” label.
Torn all the used and rejected label, blister, strip, waste PVC and Foil, Carton and Shipper and collect in separate poly bag and affix the “REJECTED” label.
Send all rejection to the scrap Yard.
The record of all the material destroyed shall be recorded as per Format “Destruction Logbook of Waste material”
The destruction of the material shall be approved by Head production/ Designee.
REFERENCE:
SOP for SOP