- OBJECTIVE
- To lay down a procedure for Maintenance of Bore well Pump
- SCOPE
- This SOP is applicable to bore well Pump, Capacity: 34 m3/HR.
- RESPONSIBILITY
- Technical Supervisor / Engineer
- ACCOUNTABILITY
- Sr.Executive / Manager
- PROCEDURE
- Monthly Maintenance
- Clean the contactors with CTC / CRC.
- Ensure the pump load should be in between 7.5-10 Amps
- Ensure no water leakages from pump and pipe lines .
- Check and ensure cable glands are tight.
- Ensure the earthing, which is connected to the pump, should also be connected to earth grid by checking with earth megger.
- Clean the control panel with air blower.
- Put a Tick mark (Ö) in Monthly Check Sheet after completion of each activity. If it is not O.K put a cross (X) in Monthly Check Sheet indicating the reason in remarks column.
- Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
- Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its complaints there of.
- Yearly Maintenance
- Check and replace the valves if valves are not functioning
- Calibrate the pressure gauges.
- Overhaul the pump.
- Put a Tick mark (Ö) in Yearly Check Sheet.
- Forms and Records (Annexures)
- Not Applicable
- Distribution
- Master copy – Quality Assurance
- Controlled copies- Quality Assurance, Production, Quality Control
- History
Date Revision Number Reason for Revision – 00 New SOP