MAINTENANCE OF BOREWELL PUMP MAKE: KSB, MODEL: UMA-C150

  • OBJECTIVE           
  • To lay down a procedure for Maintenance of Bore well Pump                  
  • SCOPE
  • This SOP is applicable to bore well Pump, Capacity: 34 m3/HR.        
  • RESPONSIBILITY
  • Technical Supervisor / Engineer       
  • ACCOUNTABILITY
  • Sr.Executive / Manager                    
  • PROCEDURE
  • Monthly Maintenance
  • Clean the contactors with CTC / CRC.
  • Ensure the pump load should be in between 7.5-10 Amps
  • Ensure no water leakages from pump and pipe lines .
  • Check and ensure cable glands are tight.
  • Ensure the earthing, which is connected to the pump, should also be connected to earth grid by checking with earth megger.
  • Clean the control panel with air blower.
  • Put a Tick mark (Ö) in Monthly Check Sheet after completion of each activity. If it is not O.K put a cross (X) in Monthly Check Sheet indicating the reason in remarks column.
  • Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
  • Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its complaints there of.
  • Yearly Maintenance
  • Check and replace the valves if valves are not functioning
  • Calibrate the pressure gauges.
  • Overhaul the pump.
  • Put a Tick mark (Ö) in Yearly Check Sheet.
  • Forms and Records (Annexures)
  • Not Applicable
  • Distribution
  • Master copy –  Quality Assurance
  • Controlled copies- Quality Assurance, Production, Quality Control
  • History
    Date Revision Number Reason for Revision

     

    00 New SOP

     

 

About Pharma Editor

Check Also

HVAC

HVAC SYSTEM AND TEST FOR HVAC QUALIFICATION

HVAC SYSTEM AND TEST FOR HVAC QUALIFICATION What is HVAC? HVAC controls Temperature, Humidity, and Air …

error: Content is protected !!