DESIGN QUALIFICATION OF AHU

DESIGN QUALIFICATION OF AHU  TABLE OF CONTENTS S.No TITLES PAGE No. 1.0 PURPOSE 3 2.0 SCOPE 3 3.0 PROJECT REQUIREMENT 3 3.1 AIR HANDLING UNIT 4   3.1.1 BASIS OF DESIGN 4   3.1.2 BASIS OF DESIGN AND ASSUMPTION 5   3.1.3 CRITICAL VARIABLES TO BE MET 5-10 4.0 COMPONENTS …

Read More »

PREVENTIVE MAINTENANCE OF PRODUCTION EQUIPMENT

PREVENTIVE MAINTENANCE OF PRODUCTION EQUIPMENT OBJECTIVE; To define the procedure for preventive maintenance of production equipment. SCOPE: This procedure is applicable for preventive maintenance of production equipment. RESPONSIBILITY: This procedure is applicable for preventive maintenance of production equipment. RESPONSIBILITY: Mechanical Engineer ACCOUNTABILITY: Engineer Head ATTACHMENTS: Attachment I – Preventive maintenance …

Read More »

All Post URL of Drugs formulations

All Post URL of Drugs formulations Tablets MFR of Albendazole Tablets – (drugsformulations.com) MFR of Alfacalcidol & Calcium Carbonate Tablets (drugsformulations.com) MFR of Sildenafil Citrate Tablets (drugsformulations.com) MFR of Paracetamol & Dicyclomine HCl Tablets – (drugsformulations.com) MFR of Dextromethorphan, Bromhexine, Chlorpheniramine Maleate & Guaifenesin  Tablets (drugsformulations.com) Dextromethorphan (drugsformulations.com) Spiramycin Tablet (drugsformulations.com) MFR of Propranolol Hydrochloride …

Read More »

Pharmaguidances Whats App Groups

Pharmaguidances Whats App Groups Pharmaguidances   Pharma Post and Jabs     Pharma Vacancy Pharma Post and Jabs 2   Pharmaguideline   Pharmaguideline 2           MFR of SALBUTAMOL SULPHATE TABLET Pharmaceutical GuidanaceMr. Shiv Kumar is the Author and founder of pharmaceutical guidance, he is a pharmaceutical …

Read More »

DESIGN QUALIFICATION FOR PURIFIED WATER STORAGE & DISTRIBUTION SYSTEM

TABLE OF CONTENTS 1.0       DESIGN QUALIFICATION PROTOCOL APPROVAL 2.0       INTRODUCTION 3.0       OBJECTIVE: 4.0       SCOPE 5.0       RESPONSIBILITY 6.0       BASIS OF DESIGN 7.0       SYSTEM DESCRIPTION 8.0     SCOPE OF SUPPLY AND TECHNICAL SPECIFICATIONS 9.0       PANEL INTERLOCKS AND OPERATIONAL LOGICS 10.0    CRITICAL SAFETY REQUIREMENTS 11.0    SAMPLING PLAN 12.0    SANITISATION CYCLE 14.0    LIST OF APPROVED …

Read More »

SOP on Operation of Effluent Treatment Plant

Objective: To lay down the procedure for operation of Effluent Treatment Plant. Scope: This SOP is applicable for engineering department for operation of effluent treatment plant at formulation plant. Responsibility: Technician/above –Engineering. Department is responsible for operation of ETP Plant. Accountability: Head- Engineering. Shall be accountable for implementation and compliance …

Read More »

Sani + Cleaning SOP ( RO )

Chemical Sanitization Procedure for RO first Pass Objective : To Disinfectant the Bacteria in RO membrane Scope :- Procedure : Prepare (0.1 – 1) % Minncare Solution in any solution preparation tank having the capacity of 300 Ltr      { Use  300ml of 100% Minncare in 300 Ltrs of Purified …

Read More »

Dust control during AHU design in Pharma Company

Dust control during AHU design in Pharma Company Dust control in Pharma Company in measure challenge Wherever possible, dust or vapour contamination should be removed at source. Point-of-use extraction, i.e. as close as possible to the point where the dust is generated, should be employed. Spot ventilation or capture hoods may …

Read More »

VALIDATION OF HVAC SYSTEM

Pharmaceutical GuidanaceMr. Shiv Kumar is the Author and founder of pharmaceutical guidance, he is a pharmaceutical Professional from India having more than 14 years of rich experience in pharmaceutical field. During his career, he work in quality assurance department with multinational company’s i.e Zydus Cadila Ltd, Unichem Laboratories Ltd, Indoco …

Read More »

MAINTENANCE OF VENTILATION SYSTEMS (EXHAUST)

OBJECTIVE            To lay down a procedure for Maintenance of Ventilation System SCOPE This SOP is applicable to Ventilation System (Exhaust).  RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Weekly Maintenance Check condition of the belt for wear, tear and damage and replace if damaged and  clean the area with …