OBJECTIVE To lay down a procedure for Maintenance of Compressed Air Distribution SCOPE This SOP is applicable to Compressed Air Distribution. RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Daily Maintenance Clean the filter bowl externally with dry Cora cloth Ensure no waste material should be lie on …
Read More »MAINTENANCE OF RAW MATERIAL COLD STORAGE, CAPACITY 5TR (TON OF REFRIGERATION)
OBJECTIVE To lay down a procedure for Maintenance of Raw Material Cold Storage SCOPE This SOP is applicable to Raw Material Cold Storage. RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Daily Maintenance Check and ensure the temperature of the cold storage should be with in the limit …
Read More »MAINTENANCE OF CHILLED WATER LINE
OBJECTIVE To lay down a procedure for maintenance of Chilled Water Line SCOPE This SOP is applicable to Chilled Water Line. RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Daily Maintenance Give the chemical dosing of 2902 …
Read More »Sanitization of Purified Water Generation and Distribution System
Objective:To lay down a procedure for Sanitization of Purified Water Generation and Distribution system. Scope:This Standard Operating Procedure is applicable to the formulation plant. Make/Capacity and EQ. ID. No. are as follows:- Sr. No. Make Capacity EQ. ID. No. 1.0 …
Read More »MAINTENANCE OF INGERSOLL RAND AIR COMPRESSOR, MODEL IHE-5-NL-2
OBJECTIVE To lay down a procedure for Maintenance of Air compressor SCOPE This SOP is applicable to Air compressor. RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Daily Maintenance Check and ensure oil level as per the mark given on the view glass. Clean the outer surface of …
Read More »MAINTENANCE OF BOREWELL PUMP
OBJECTIVE To lay down a procedure for Maintenance of Bore well Pump SCOPE This SOP is applicable to bore well Pump RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Monthly Maintenance Clean the contactors with CTC / CRC Ensure the …
Read More »MAINTENANCE OF AIR HANDLING UNIT MAKE: BLUE STAR
OBJECTIVE To lay down a procedure for Maintenance of Air Handling Unit SCOPE This SOP is applicable to Air Handling Unit. RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Sr.Executive / Manager PROCEDURE Daily Maintenance Check and ensure that the difference between inlet and outlet temperature of chilled water is within the …
Read More »CLEANING OF AIR HANDLING UNIT (AHU) FILTERS
OBJECTIVE To lay down a procedure for Cleaning of Air Handling Unit (AHU) filters 20 Micron, 10 Micron , 5 Micron SCOPE This SOP is applicable to cleaning of Air Handling Unit (AHU) filters 20 Micron , 10 Micron, 5 Micron . RESPONSIBILITY Technical Supervisor / Engineer ACCOUNTABILITY Manager PROCEDURE …
Read More »Performance Qualification Protocol Bung washer
Performance Qualification Protocol Bung washer OBJECTIVE To establish documented evidence that will provide a high degree of assurance and reliability about the performance of the BUNG WASHING MACHINE. To verify the Rubber stopper washing process is capable of consistently and reliably removing Particulate matter contaminants, such as dust, lint, fibers, …
Read More »Performance Qualification Protocol. Vial washing machine
OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the VERTICAL ROTARY VIAL WASHING MACHINE. To verify the vial washing process is capable of consistently and reliably producing appropriate washing of different types of vials at different speeds encountered in …
Read More »