MAINTENANCE OF DEHUMIDIFIERS, BRY-AIR MAKE, MVB MODEL

OBJECTIVE                                               To lay down a procedure for Maintenance of Dehumidifier SCOPE This SOP is applicable to all Dehumidifiers. RESPONSIBILITY             Technical Supervisor / Engineer ACCOUNTABILITY                     Sr.Executive / Manager PROCEDURE Daily Maintenance Check and ensure no unusual noise form the Actuator motor, Process air & Reactivation motor. Ensure the motor should be free from dust Check and … Read more

MAINTENANCE OF SCREW CHILLER MAKE: YORK

OBJECTIVE                                               To lay down a procedure for the Maintenance of the Screw Chiller SCOPE This SOP is applicable to Screw Chillers. RESPONSIBILITY             Technical Supervisor / Engineer ACCOUNTABILITY                     Sr.Executive / Manager PROCEDURE Daily Maintenance  Check and ensure oil level as per the mark given on the … Read more

MAINTENANCE OF DISPENSING BOOTH

OBJECTIVE         To lay down a procedure for Maintenance of Dispensing booth SCOPE This SOP is applicable to Dispensing booth. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Quarterly Maintenance            Check and ensure the free rotation of the blower motor shaft. Check the full load current in all phases of the motor Re greases … Read more

Submission of new SOP and changes to existing SOP

OBJECTIVE :    To provide a system for initiating a new SOP and to update an existing SOP. RESPONSIBILITY : The Department Head/Section In charge shall ensure that all SOPs pertaining to their department are prepared/updated and routed for approval. Procedure :             Submission of new SOP :                 The request for a new SOP shall be initiated … Read more

MAINTENANCE OF FINISHED GOODS STORES AIR CONDITIONING SYSTEM MAKE: BLUE

OBJECTIVE            To lay down a procedure for Maintenance of Finished Goods Stores Air Conditioning system SCOPE This SOP is applicable to Finished Goods Stores Air Conditioning System, Model: ACU20B, Capacity: 18 Ton of Refrigeration. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Daily Maintenance Check and ensure that the difference between inlet and … Read more

MAINTENANCE OF SAMPLING BOOTH

OBJECTIVE          To lay down a procedure for Maintenance of Sampling booth  SCOPE This SOP is applicable to Sampling booth. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE           . Quarterly Maintenance Check and ensure the free rotation of the blower motor shaft. Check the full load current in all phases … Read more

MAINTENANCE OF RAW WATER DISTRIBUTION SYSTEM

OBJECTIVE            To lay down a procedure for Maintenance of Raw Water Distribution System                 SCOPE This SOP is applicable for Raw Water Distribution System. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE  Monthly Maintenance Check the motorized valves functioning of auto valves. Check free rotation of auto valve manually. Check and ensure no water … Read more

MAINTENANCE OF VENTILATION SYSTEMS (SUPPLY & EXHAUST)

OBJECTIVE            To lay down a procedure for Maintenance of Ventilation System SCOPE This SOP is applicable to Ventilation System (Supply & Exhaust). RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Weekly Maintenance Check condition of the belt for wear, tear and damage and replace if damaged and  clean the area with cora cloth Ensure … Read more

MAINTENANCE OF DUST COLLECTION SYSTEM WHIRL WIND MAKE

OBJECTIVE                                               To lay down a procedure for Maintenance of Dust Collection system SCOPE This SOP is applicable to all Dust Collection system. RESPONSIBILITY             Technical Supervisor / Engineer ACCOUNTABILITY                     Sr.Executive / Manager PROCEDURE Weekly Maintenance  Check and ensure the belts are not loose or excessive tight. Ensure no air leakage from the rexine cloth connection from … Read more