- Objective:To lay down an Operating Procedure for Air Handling Units, Exhaust,Supply and Ventilations Units.
- Scope:This Standard Operating Procedure is applicable to the formulation plant of Pharmaceutical Company.
- Responsibility:
- The Concerned Technician shall follow the Operating Procedure as per this SOP
- The Officer/Executive-Engineering shall be responsible for implementation of the procedure as per this SOP.
- Accpuntability: Head-Engineering/Designee shall ensure the compliance of the procedure as per this SOP.
- Abbreviations and Definitions:
- MCC :Machine Control Center
- BMS : Building Management System
- VFD : Variable Frequency Drive
- DDC : Digital Display Control
- RH : Relative Humidity
- RA : Return Air
- AHU : Air Handling Unit
- Procedure
- In Auto Mode
- Pre Startup Checkup:
- Ensure Power supply shall “ON” from MCC panel for all Air Handling Units,Exhaust and Supply and Ventilations Units.
- Ensure Chilled Water and Hot water circulation is going on. Working Pressure of Chilled water and Hot water shall be more than 1 Kg/Cm2.
- All VFD’s and Starters shall be in remote/auto mode.
- UPS power supply to BMS and all DDC panels shall be “ON”.
- Starting Procedure:
- All AHUs, Global Exhaust, Global Supply and all ventilation Unit shall start through BMS which is Programmed for as per following sequence:-
- Core Corridor’s AHUs and Exhaust Unit shall start before 10 minutes of other AHUs as scheduled.
- After 10 minutes all other AHUs, Supply and Ventilation Units shall start as scheduled.
- All AHUs are programmed for Design Temperature and RH settings. If there is any change in room condition requirement then Engineering-Executive/ Officer can only change the setting.
- There are three level securities Password in BMS login.
- One is primary level for operator. Operator shall be authorized for data checking only he can also take printout of data like RA Temperature, RH.
- Second level is for Engineering persons who can change the:
- Room condition settings.
- Change in Alarm setting.
- To make new login for Operators
- Third level is for Administrator. In this level only ABB Engineer is authorized to change all setting, Change password of Second Level and reprogram the system.
- Record all the data after every three hours as per Annexure-I.
- In Manual Mode
- Pre Startup Checkup
- Ensure Power supply shall “ON” from MCC panel for all Air Handling Units,Exhaust and Supply and Ventilation Units.
- Ensure Chilled Water and Hot water circulation is going on. Working Pressure of Chilled water and Hot water shall be more than 1 Kg/Cm2.
- All VFD’s and Starters shall be in Manual/Local mode.
- Starting Procedure
- Start the core corridor AHU’s along with exhaust unit to maintain positive pressure in core corridor.
- Start the all other AHU’s along with ventilation units after 10 minutes of Core Corridors AHU’s and Global Exhaust Units.
- Record all the data after every three hours as per Annexure-I.
- Pre Startup Checkup
- Forms and Annexure:
- Logbook : Annexure – I
- Distribution
- Master Copy : Documentation Cell
- Controlled Copies :Engineering, Quality Assurance, Production,Warehouse, Quality control, Administration and House Keeping.
- History
Date | Revision Number | Reason for revision |
– | 00 | New SOP |