MAINTENANCE OF CONDENSOR WATER PUMPS/ CHILLED WATER PUMPS, MAKE: BEACON

OBJECTIVE                                    To lay down a procedure for Maintenance of Condenser water Pumps/ Chilled Water Pumps SCOPE  This SOP is applicable to A/C plant Condenser/Chilled Water Pumps. RESPONSIBILITY  Technical Supervisor / Engineer                    ACCOUNTABILITY  Sr.Executive / Manager                                 PROCEDURE Daily Maintenance Clean the motor, pump, pipelines etc. externally with Cora cloth. Check any …

Read More »

MAINTENANCE OF BOREWELL PUMP MAKE: KSB, MODEL: UMA-C150

OBJECTIVE            To lay down a procedure for Maintenance of Bore well Pump                   SCOPE This SOP is applicable to bore well Pump, Capacity: 34 m3/HR.         RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Monthly Maintenance Clean the contactors with CTC / CRC. Ensure the pump load should be in …

Read More »

DISPOSAL OF DUST COLLECTED FROM DUST COLLECTION SYSTEM

OBJECTIVE            To lay down a procedure for Disposal of Dust collected from Dust Collection System. SCOPE This SOP is applicable to all Dust Collection Systems. RESPONSIBILITY Technical Supervisor / Engineer                    ACCOUNTABILITY Sr.Executive / Manager          PROCEDURE Frequency     Dust is removed system wise, once in a Month. Dust is removed during product …

Read More »

MAINTENANCE OF COOLING TOWER

MAINTENANCE OF COOLING TOWER OBJECTIVE                                               To lay down a procedure for Maintenance of Cooling Tower SCOPE This SOP is applicable to Cooling Tower. RESPONSIBILITY             Technical Supervisor / Engineer ACCOUNTABILITY                     Sr.Executive / Manager PROCEDURE Daily Maintenance Check for any vibration and abnormal noise from the Total unit. Check and ensure free …

Read More »

MAINTENANCE OF COMPRESSED AIR DISTRIBUTION

OBJECTIVE                                               To lay down a procedure for Maintenance of Compressed Air Distribution SCOPE This SOP is applicable to Compressed Air Distribution. RESPONSIBILITY             Technical Supervisor / Engineer ACCOUNTABILITY                     Sr.Executive / Manager PROCEDURE  Daily Maintenance Clean the filter bowl externally with dry Cora cloth Ensure no waste material should be lie on …

Read More »

RAW MATERIAL COLD STORAGE

RAW MATERIAL COLD STORAGE Raw materials must be stored in controlled temperature environments to guarantee their durability and uphold the quality and safety of the final products. This blog explores the importance of cold storage for raw materials, the advantages it offers, and the essential factors that businesses should consider …

Read More »

CHILLED WATER

CHILLED WATER Chilled water systems have become a pioneering solution, transforming how we cool our buildings and industrial areas. Going beyond conventional air conditioning techniques, It presents a sustainable and economical option. we delve into the fundamentals of chilled water technology, its wide-ranging applications, and the environmental and financial advantages …

Read More »

Process Validation: General Principles and Practices (January 2011)

Process Validation The concept of the product lifecycle connects the development of the product and the manufacturing process, the qualification of the commercial manufacturing process, and the maintenance of the process to ensure control during routine production. This guidance promotes scientific principles to support process improvement and innovation. This guidance …

Read More »

Sanitization of Purified Water Generation and Distribution System

Purified Water Purified water is more than just a thirst-quenching beverage; it’s a cornerstone of health and well-being. In this blog, we explore the significance of purified water, the various purification methods, and why its consumption is essential for a healthy lifestyle. Purification Methods: Purified water undergoes processes that eliminate …

Read More »

AIR COMPRESSORS

AIR COMPRESSOR OBJECTIVE: To lay down a procedure for the Maintenance of the Air compressor SCOPE: This SOP applies to Air compressors. RESPONSIBILITY: Technical Supervisor / Engineer        ACCOUNTABILITY: Sr.Executive / Manager                     PROCEDURE Daily Maintenance Check and ensure the oil level is as per the mark given on the view glass. …

Read More »

BOREWELL PUMP

BOREWELL PUMP Borewell pumps stand as silent workhorses, drawing water from the depths below. These essential devices have transformed the way we access and utilize groundwater, playing a pivotal role in sustaining life and supporting various economic activities. Borewell Pumps: Functionality: Borewell pumps are specialized devices designed to extract water …

Read More »

AIR HANDLING UNIT

Maintenance of Air Handling Unit OBJECTIVE: To lay down a procedure for the Maintenance of the Air Handling Unit SCOPE: This SOP applies to the Air Handling Unit. RESPONSIBILITY: Technical Supervisor / Engineer        ACCOUNTABILITY: Sr.Executive / Manager                     PROCEDURE :  Daily Maintenance Check and ensure that the difference between the inlet …

Read More »

CLEANING OF AIR HANDLING UNIT (AHU) FILTERS

OBJECTIVE To lay down a procedure for Cleaning of Air Handling Unit (AHU) filters  20 Micron, 10 Micron , 5 Micron  SCOPE This SOP is applicable to cleaning of Air Handling Unit (AHU) filters 20 Micron , 10 Micron, 5 Micron . RESPONSIBILITY  Technical Supervisor / Engineer ACCOUNTABILITY  Manager  PROCEDURE …

Read More »

Cleaning Validation Protocol

Cleaning Validation Protocol CONTENTS S. No. Topic Page No. 1.0 Protocol Preparation and Approval Sheet 2.0 Objective 3.0 Scope 4.0 Responsibility 5.0 Validation Team 6.0 Abbreviations and Definitions 7.0 Cleaning Validation Approach 7.1 Selection of Products 7.2 Selection of Equipments 7.3 Type  Cleaning after every five consecutive batches of the …

Read More »

Performance Qualification Protocol. Bung washer

OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the BUNG WASHING MACHINE. To verify the Rubber stopper washing process is capable of consistently and reliably removing Particulate matter contaminants, such as dust, lint, fibres etc., Bacterial Endotoxins, from the …

Read More »

Performance Qualification Protocol. Vial washing machine

OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the VERTICAL ROTARY VIAL WASHING MACHINE. To verify the vial washing process is capable of consistently and reliably producing appropriate washing of different types of vials at different speeds encountered in …

Read More »

Performance Qualification Protocol Vial sealing machine

Performance Qualification Protocol Vial sealing machine OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the Vial sealing Machine. To demonstrate that the equipment / system is performing reproducibly and consistently within its operating range of operation and suitable for …

Read More »

Performance Qualification Protocol for Vial Filling Machine

Performance Qualification Protocol for Vial Filling Machine OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the Vial Filling Machine. To Demonstrate that the equipment / system is performing reproducibly and consistently within its operating range of operation and fill …

Read More »

Sop for operation of BOPP taping machine

Objective: To lay down a procedure for operation of BOPP taping machine. Scope This SOP is applicable for operation of BOPP taping machine. Responsibility Officers or above – Production. Accountability Production Head. Abbreviations SOP : Standard Operating Procedure. BOPP : Biaxial Oriented Polypropylene IPQA : In-process Quality Assurance Procedure Pre-Start …

Read More »

SOP on operation of packing conveyer belt

Objective To lay down the procedure for the operation of packing conveyer belt. Scope:  The SOP is applicable for the operation of packing conveyer belt installed in the packing hall of sterile injectables facility.  Responsibility Officers and above-Production Accountability Production Head Abbreviations MCB : Miniature Circuit breaker Procedure Ensure that …