SOP on operation of packing conveyer belt

  • Objective
  • To lay down the procedure for the operation of packing conveyer belt.
  • Scope:
  •  The SOP is applicable for the operation of packing conveyer belt installed in the packing hall of sterile injectables facility.
  •  Responsibility
  • Officers and above-Production
  • Accountability
  • Production Head
  • Abbreviations
  • MCB : Miniature Circuit breaker
  • Procedure
  • Ensure that the packing conveyer belt is properly cleaned before starting the packing operation.
  • Ensure that line clearance has been done before starting the packing operation.
  • Switch on the Power supply of the packing conveyer belt from the mains.
  • Switch on the control panel of the conveyer belt by moving the MCB to on position.
  • Press Run/Stop Switch once to start the conveyer belt.
  • Adjust the speed of the conveyer belt by pressing the control switches on the control    panel.
  • Press Run/Stop switch once to stop the packing belt at the end of the packing activities.
  • Switch off the control panel of the conveyer belt by moving the MCB to off position.
  • Switch off the Power supply of the packing conveyer belt from the mains.
  • Clean the packing conveyer belt as per Sop on cleaning of conveyer belt.
  • Record the operation and cleaning details in the Equipment Operation cleaning & maintenance Log Book format No: QASG040/F01-00 and Batch Packing Record and get it checked by the production officer/supervisor.
  • Forms and Records (Annexures)
  • Not Applicable
  • Distribution
  • Master copy –   Quality Assurance
  • Controlled copies- Quality Assurance, Production, Quality Control
  • History
    Date Revision Number
    Reason for Revision
    00 New SOP

 

 

Pharma More Jobs and post Please click here

About Pharma Editor

Check Also

Production and Process Controls

Production and Process Controls Each manufacturer shall develop, conduct, control, and monitor production processes to …