- Objective:To lay down a procedure for Sanitization of Purified Water Generation and Distribution system.
- Scope:This Standard Operating Procedure is applicable to the formulation plant of pharmaceutical Company.
- Responsibility
- The Concerned Technician shall follow the Sanitization Procedure as per this SOP.
- The Officer/Executive-Engineering shall be responsible for implementation of the procedure as per this SOP.
- Accountability: Head-Engineering and QA shall accountable for the compliance of the procedure as per this SOP.
- Abbreviations and Definitions:
- RO: Reverse Osmosis
- MCB: Miniature Circuit Board
- MCF: Micron Cartridge Filter
- EDI :Electro De-Ionization
- MMI: Man Machine Interface
- EHE: Electric Heater
- NMT: Not More Than
- Procedure:
- Sanitization of Purified Water Generation System
- RO membranes are sanitized by using RO permeate which filtered through MCF . The water in tank is heated by means of electrical heater which is installed inside the tank.
- Sanitization procedure is as follows:
- Make sure that the main supply of 240 Volts to panel is coming properly and turn “ON” all MCB switches.
- For RO-1 sanitization open pump suction valve and Discharge valve and all other valves are closed.
- For RO-2 sanitization open pump suction valve and discharge valve.
- For EDI sanitization open the pump suction valve and discharge valve.
- Start the pump and circulate warm water (NMT 45°C) with a maximum pump discharge of 2.5 kg/cm2.
- Start the heater EHE. Set temperature as 85°C and temperature rises at NMT 4°C per minute.
- Continue the circulation till the temperature reaches up to maximum 85°C.
- When temperature reaches 80°C switch “OFF” the heater EHE. Don’t stop circulation.
- Maintain temperature for 60-90 minutes.
- After completion of sanitization allow system to cool to 45°C or below.
- Flush the system with water of maximum feed pressure of 2.5 kg/cm2.
- Frequency: minimum twice a month.
- Monitor and Record all the observations in log sheet (Annexure1).
- Sanitization Procedure For Distribution System
- Switch “ON” the main power supply to the panel by means of starter switch at side of control panel.
- Turn “ON” the MCB inside the control panel for powering the PLC and MMI.
- Press the ‘ENTER’ button on the MMI to start the system.
- Make sure the utilities (i.e. compressed air and steam) are available to the system at required pressure and temperature respectively.
- Make sure all the pump suction and discharge valves are kept open.
- Make sure the MCB for the pumps are turned “ON” inside the control panel.
- Put the system in ‘AUTO’ mode with the help of selector switch (AUTO /OFF/ MANUAL) on the panel door.
- Drain the water in storage tank T-2101 till the water level reaches for sanitization by opening the drain valve or feed the water to reach water level if the water level is low.
- Press the SET button on the main screen to go to SET parameters for sanitization of distribution system.
- Enter the time for sanitization say 60 mins.
- Enter the temperature for sanitization as 85°C at which the system is to be sanitized and the Hysterisis value for the temperature set point as 4°C
- To put the system in sanitization mode turn “ON” the sanitization selector switch.
- Ensure that all the drain / sampling valves are in closed condition.
- The tank steam inlet valve will open and close depending on the temperature of the water for a pre settable time. As soon as the temperature of water in return line reaches above the specified value then actuated valve turns OFF.
- During sanitization, all the valves and pumps will be operational with the help of Selector switches and push buttons on the main door.
- After completion of sanitization cycle, turn “OFF” the sanitization selector switch.
- Empty the Distribution system by opening the drain valves. Also open up all the sampling valves while draining off the system.
- Let the tank be as it is for atmospheric cooling for 15-20 mins.
- Fill in fresh water in the tank and recalculate for 30 mins.
- Again drain the whole system and fill fresh UF water.
- The distribution system is now ready for operation.
- Forms and Records
- Record of Sanitization of Purified Water System- Annexure-I
- Distribution
- Master Copy : Documentation Cell (QA)
- Controlled Copies : Engineering, Production, Quality Assurance, Warehouse,Quality Control, Administration and House Keeping
- History
Date | Revision Number |
Reason for Revision |
– | 00 | New SOP |