- OBJECTIVE
- To lay down the procedure for Operation of Milli Q water system, Make Millipore.
- SCOPE
- This SOP shall provide the Operating procedure of Milli – Q water system of quality control department.
- RESPONSIBILITY
- Officer/ Executive – Quality Control
- ACCOUNTABILITY
- Head QC/QA
- PROCEDURE
- OPERATION OF ELIX –10
- Switch on Elix – 10 power supply button provided backside of the instrument.
- Indicator green light glows and LCD Screen displays
ELIX 10
SR.NO-
- Above information shall be displayed for few seconds and system goes in stand by mode.
- System starts performing flushing and returns to normal stand by mode.
- Press and hold for about 5 seconds operate / stand by button to switch in to operation mode.
- In operation mode system collects water from source and starts purification.
- The LCD screen while operation mode shows
PRES : XXX %TANK
RO Feed: XXX µ S
- Note: Do not operate the system with pressure less than 2.0 kg/cm2 (system starts alarm – red light blinks and LCD shows LOW PRES) , if required switch on the power of primary cartridge filter pump for required pressure.
- Purified water generated from the ELIX –10 collected continuously in HDPE – 30 liters storage tank.
- System stops/ starts automatically when HDPE TANK is full/empty.
- Note: Do not collect water from storage tank when ELIX –10 Screen shows less than 30 % tank full, allow the system to collect water minimum up to 60 % tank full condition.
- Whenever required, Collect the water from HDPE storage tank for the purpose of dissolution / disintegration testing and their bath filling purpose only.
- OPERATION OF GRADIENT A 10
- Switch on GRADIENT A 10 power supply button provided backside of the instrument.
- Indicator green light glows and LCD Screen displays
GRADIENT A 10 V 3.05
SR.NO°
for few seconds and starts in stand by mode.
- Press and hold for about 5 seconds OPERATE / STAND BY button to switch in to operation mode.
- Move the point of use trigger forward till the green bulb glowing starts to initiate the water purifying process.
- When the bulb is glowing GRADIENT A 10 LCD screen shows the quality of water in terms of conductivity in µS at @25°C and TOC level in ppb.
- Move the point of use trigger forward and collect the required quantity of water.
- Close the point of use trigger backward after collecting water.
- This water shall be used for all laboratory grade water (i.e. – for the purpose of HPLC analysis, column washing, glassware final rinsing, chemicals/ reagents preparation, final dilutions).
- NOTE:
- Do not use the water if conductivity is more than 1.3 µ S and TOC level is more than 500 ppb.
- Do not collect water when HDPE TANK is ≤ 30 % full. Allow the system to collect water minimum up to 60 % of tank full condition.
- Replacing frequency of Cartridges of ELIX –10 / GRADIENT A10 shall be half – yearly or if the system fails to produce the water of required quality ( conductivity – ≤ 1.3 µ S and TOC – ≤ 500 ppb.
- Note the reading of conductivity & TOC ,twice in a day, preferably startup & end of the shift .
- Forms and Records (Annexures)
- Not Applicable
- Distribution
- Master copy – Quality Assurance
- Controlled copies- Quality Assurance, Production, Quality Control.engineering
- History
Date Revision Number Reason for Revision – 00 New SOP