OPERATIONAL QUALIFICATION PROTOCOL FOR COATING MACHINE
TABLE OF CONTENT
- Purpose
- Scope
- Responsibilities
- Procedure
- Operational qualification tests
- Main Panel / Control Panel Testing
- Power & Communication Failure Recovery Verification
- Variable RPM verification
- Operational Qualification Test Status
- List of Standard Operating Procedures
- Data Analysis, Summary of OQ & Recommendations
- Amendment record
- Conclusion
- PURPOSE
To describe the Operational Qualification procedure to be used during qualification of Coating Machine and to define the specification of the system in order to:
- Ensure that the equipment meets the Operational/Design limits.
- Ensure that the equipment will be operationally qualified in accordance with current Good Manufacturing Practices.
- SCOPE
This procedure applies to the Operational qualification of Coating Machine to be installed at Pharmaceutical Company.
- RESPONSIBILITIES
- It is the responsibility of the Validation Team to prepare and check the operation qualifications protocol.
- It is the responsibility of the Quality Assurance to approve the operation qualification protocol.
- It is the responsibility of the Validation Team to perform and check all the specifications verification checks with respect to operation qualifications protocol and compiling data.
- It is the responsibility of the Quality Assurance to approve the operation qualification.
- PROCEDURE
The following requirement / practices apply to Coating Machine Operational Qualification activities:
- To verify the components design parameters.
- Review the preventive maintenance procedures, cleaning procedures and general operational procedure to ensure that they are comprehensive for reliable performance of the equipment.
- OPERATIONAL QUALIFICATION TESTS
The table below lists the tests to be performed as part of the Operational Qualification phase.
TEST NUMBER | CRITICAL FEATURE |
Main Panel/Control Panel Testing | |
Power & Communication Failure Recovery Verification | |
Variable RPM verification | |
Operational Qualification Test Status |
- Main Panel / Control Panel Testing.
- Purpose –
To verify that the response of the equipment at the input from various Push button / Switches on control or main panel is as per the system design.
- Test equipment –
None Required.
- Procedure –
- Give inputs from various Push buttons & Switches on Control Panel / Main Panel & observe the response from the machine.
- Acceptance Criteria –
- The equipment will respond as mentioned in the target column of the table given below.
- Take dry run of the equipment to ensure that all controlling parameters & functions are reproducible.
- Test Results
Input | Target | Actual | Test Done by | Date |
Main Panels main switch switched ON. | Machine ON indicator shall glow | |||
Main motor START button pressed | Main motor shall start and pan shall start rotating | |||
Blower motor START button pressed | Blower motor shall start running | |||
Main motor Stop Button is pressed | Pan shall stops rotating | |||
Blower motor STOP button pressed | Blower motor shall stop running |
- Power & Communication Failure Recovery Verification
- Rationale –
To verify that in the event of a power loss or communications failure, the equipment will stop in safe condition.
- Test equipment –
None Required.
- Procedure for Power and Communication Failure Recovery test –
- Operate the equipment as directed in the User Manual.
- While the equipment is operating, shut down the power to the main control panel. Record if the equipment stops in a safe and secure condition.
- Wait for 5 minutes then restore power to the equipment.
- Check whether system is start running once the power is restored.
- The system is not starting of its own, restart the equipment; check operation and note any adverse condition.
- Acceptance criteria –
- The equipment stops in a safe and secure condition.
- The equipment should not start of its own after the power is restored without user permission.
- The equipment can be restarted with NO problems or adverse conditions.
- Power and Communication Failure Recovery test results
Test | Results | Meets Test
(Yes / No) |
Test Done by | Date |
Main Power Shut Down | Equipments Stops in a secure and safe condition | |||
Main Power Restored | Equipments is not starting of its own without user permission | |||
Equipment can be restored with no problem or adverse condition |
Variable RPM verification test
- Purpose –
To check the equipment rotation by moving the main motor forward and backward.
- Test equipment –
Digital Tachometer Required.
- Procedure –
- Start the equipment.
- Measure the RPM using digital tachometer and note down the RPM in the table.
- Change the position of main motor by rotating the wheel in clockwise and anticlockwise direction as mentioned in the table and repeat the above procedure.
- Acceptance Criteria –
- The equipment will respond as mentioned in the target column of the table given below.
- Variable RPM verification test results
Test | Results | Meets Test
(Yes / No) |
Test Done by | Date |
Main motor switched ON and check the RPM with digital tachometer | Pan shall start rotating | |||
Turn OFF the main motor | Pan shall stop rotating | |||
Rotate the wheel in clockwise direction | Main motor shall move forward. | |||
Main motor switched ON and check the RPM with digital tachometer | Pan shall start rotating. The RPM shall increase | |||
Turn OFF the main motor | Pan shall stop rotating | |||
Rotate the wheel in anticlockwise direction | Main motor shall move backward. | |||
Main motor switched ON and check the RPM with digital tachometer | Pan shall start rotating. The RPM shall decrease |
- Operational Qualification Tests Status
The table below lists the tests performed and related results.
Test Number
|
Critical Feature
|
Pass / Fail | Deviation Found | ||
Pass | Fail | Yes | No | ||
Main/Control Panel Testing | |||||
Power & Communication Failure Recovery Verification | |||||
Variable RPM verification test |
- LIST OF STANDARD OPERATING PROCEDURES
Sr. No. | Description | SOP No | Verified By | Date |
1 | Operating Procedure of Coating Machine | |||
2 | Cleaning Procedure of Coating Machine | |||
3 | Preventive maintenance of Coating Machine |
Data Analysis, Summary of OQ AND RECOMMENDATIONS
- AMENDMENT RECORD
Sr. No. | Item Name | Remarks | Signature and Date |
Note : Any changes made in the system must be recorded in this sheet.
CONCLUSION
Pharma More Jobs and post Please click here