SOP of Fogging of Microbiology Testing Areas
Objective
To lay down the procedure for Fogging of Microbiology Testing Areas.
Scope
This SOP is applicable for Fogging of Microbiology Testing Areas in Microbiology Laboratory of (Pharmaceutical Company Name).
Responsibility
Chemist or above of Microbiology Laboratory.
Head – Microbiology Section.
Accountability
Head – Quality Control.
Abbreviations and Definitions
SOP : Standard operating procedure
No. : Number
QC : Quality Control
QA : Quality Assurance
SS : Stainless Steel
MLT : Microbial Limit Test
Procedure
Operation
Perform the Fogging of Microbiology once in a week at the end of working hours
Perform the fogging on below mentioned areas on different days
Sterility testing area
MLT, Subculture room and MLT section corridor and Change room.
Sterilization area
Make sure that the area is thoroughly cleaned before fogging.
Close all the dampers.
Switch off all the AHU.
Enter into the area to be fogged as per the SOP No.along with the fogger (Micro mist and Nanotech) filled with the required quantity of dilute disinfectant.
Sterility testing area:
Switch off the interlocking of the sterility testing area.
Enter into change room-4 as per the SOP No for the area along with the fogger filled with dilute Virosil.
Keep the doors between change room-2 & 3 and change room 3 & 4 open.
Place the fogger in one corner of change room-4.
Adjust the motor angle at 45˚C and the timer to 0.5 liter.
Connect the power cord of the fogger to the mains and switch on the fogger and quickly move out of the room into the sterility room and close the door.
Wait in the sterility room for the fogging to complete.
As soon as the fogging is complete, quickly transfer the fogger from change room-4 to Sterile Buffer room and place similarly.
Adjust the timer to around 0.7 liter.
Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the sterility test room.
Wait for the fogging to complete.
As soon as the fogging is complete, quickly transfer the fogger from Sterile Buffer room to Sterility test room and place it similarly.
Adjust the timer to around 0.7 liter.
Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the Return Buffer room and close the door.
As soon as the fogging is complete remove the fogger from the sterility test room and then place the fogger in change room-1.
Keep the doors between Return buffer & Return A/L and Return A/L & Change room-1 open.
Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the Microbiology corridor and close the door.
Place a tag “Area under Fogging” as per Annexure No on the entry door and leave the area undisturbed for overnight.
MLT Section:
Switch off the AHU of the MLT Section.
Enter into the MLT Section as per the entry SOP No. along with the fogger.
Enter the Subculture room and place the fogger in one corner on a SS stool and connect the power cord of the fogger to the mains.
Adjust the timer of the fogger to 0.5 liter and switch on the mains.
Quickly move out of the room, close the door properly and wait in the change room till the fogging is completed.
As soon as the fogging is completed quickly take the fogger out of the subculture room and then fog the MLT room using the same procedure.
After the fogging is complete in the MLT room quickly take out the fogger from the
MLT room and place it in one corner of the change room on a SS stool.
Adjust the motor angle at 45˚C and the timer to 1.0 liter.
Connect the power cord of the fogger to the mains and switch on the mains and quickly move out of MLT section.
Place a tag “Area under Fogging” as per Annexure No. on the entry door and leave the area undisturbed for overnight.
Sterilization area:
Switch off the AHU of the Sterilization area.
Enter into the Sterilization area as per the entry SOP No along with the fogger.
Enter the Media decontamination room and place the fogger in one corner on a SS stool and connect the power cord of the fogger to the mains.
Adjust the motor angle at 45˚C and the timer to 0.5 liter.
Switch on the mains and quickly move out of the room.
As soon as the fogging is completed quickly take the fogger out of the Media decontamination room and then fog the Media preparation room, following the same procedure.
After the fogging of the Media preparation room, quickly take out the fogger and place in one corner of the sterilization room on a SS stool.
Adjust the motor angle at 45˚C and the timer to 1.0 liter.
Switch on the mains and quickly move out of the room.
Place a tag “Area under Fogging” as per Annexure No. on the entry door and leave the area undisturbed for overnight.
Dilute and use required volume of Virosil as per Table-I.
Pour the prepared disinfectant solution in to the tank of fogger prior to entering the area to be fumigated.
Operate the fogger as per SOP No.:
Come out of the room using exit process of the particular area.
Put the label as ‘Area under Fogging’. Keep the area under this condition for overnight.
In the next day morning, switch on the AHU. Open the dampers.
Enter the area as per respective entry procedure. Close all the doors. Remove the Fogging set and exit along with the set.
Record the fogging details as per Annexure No.:
Table-I. Dilution and Use Volume of Virosil
Name of the Area | Name of Fogging
Solution |
Volume of fogging
Solution Concentrate. (ml) |
Volume of WFI/ PW (ml) | Total Volume
(ml) |
Sterility Testing room | Virosil | 150 | 600 | 750 |
Sterile Buffer room | Virosil | 150 | 600 | 750 |
Change rooms-2, Change room-3 and Change room-4 | Virosil | 100 | 400 | 500 |
Return Buffer, Return A/L and Change room-1 | Virosil | 100 | 400 | 500 |
Sub-culture room | Virosil | 100 | 400 | 500 |
MLT room | Virosil | 100 | 400 | 500 |
MLT A/L and Change room | Virosil | 200 | 800 | 1000 |
Media decontamination room | Virosil | 100 | 400 | 500 |
Media preparation room | Virosil | 100 | 400 | 500 |
Sterilization area and Washing area | Virosil | 200 | 800 | 1000 |
Forms and Records (Annexures)
Fogging Record
Label for Area Under Fogging
Distribution
Master copy – Quality Assurance
Controlled copies – Quality Assurance, Production, Quality Control, Stores, Engineering and Human Resource
History:
Date | Revision Number |
Reason for Revision |
00 | NEW SOP |
For More Pharma Updates Visit –https://pharmaguidances.com