Template for Operational Qualification Protocol

Operational Qualification Protocol PURPOSE To describe the Operational Qualification of Name of the Equipment and to define the specification of the system in order to: Ensure that the equipment will be operationally qualified in accordance with current Good Manufacturing Practices Ensure that the equipment meets the Operational/Design limits as per …

Read More »

PQ of WFI generation, storage and distribution system

PQ of WFI generation, storage, and distribution system Protocol Approval This is a specific protocol for Performance Qualification of Water for Injection generation, Storage, Distribution System, which is located in the first floor of the production department. This protocol has been approved by the following:                     Name  Department  Signature …

Read More »

Template for Installation Qualification Protocol

Template for Installation Qualification Protocol PURPOSE To describe the Installation Qualification procedure to be used during qualification of Name of Equipment machine to define the Specification of the system in order to Ensure that the equipment meets the specification as per Design Qualification (Doc Number). Aid verification of the installation …

Read More »

Template for User Requirement Specification (URS)

Tamplate for User Requirement Specification TECHNICAL Specifications S. No. Parameters Required Specifications 1. 1.1 1.2 1.3 1.4 1.5  General Equipment No. Description Use Field Identification Glossary             2. 2.1   2.2 2.3 2.4 Salient Features General   Material of Construction Finish Electrical Construction   Smooth  Finish/matt …

Read More »

Template for Design Qualification Protocol

Template for Design Qualification Protocol OBJECTIVE To design, engineer, and supply the Name of Equipment and to provide assurance that the machine is manufactured as per the URS:  Doc Number and it complies with the Scope of Supply. To prove that each operation proceeds as per the design qualification and …

Read More »

Template for Process validation protocol

Template for Process validation protocol Objective To provide documented evidence with high degree of assurance that the manufacturing process is capable of producing the finished product consistently of required quality, meeting its predetermined specifications and quality attributes. Scope   This process validation protocol is applicable to carry out process validation …

Read More »

Installation qualification for pure steam generator

Installation qualification for pure steam generator OBJECTIVE To confirm, by physical inspection and testing, that the fabrication and assembly of the equipment and any auxiliary support systems, conforms to the Design parameters as per the Design Review. SCOPE  The tests shall be carried out at customer place. The verification of …

Read More »

Hydro Testing Procedure for Purified Water Distribution Loop and Purified Water Storage Tank

Hydro Testing Procedure for Purified Water Distribution Loop Objective : To ensure that the Purified Water Distribution Piping is Leakage proof from TC joints & Orbital Weld joints. Scope :Applicable for Hydro Testing of Purified Water Distribution Loop Procedure : Fill the Purified Water Distribution piping loop completely with Purified …

Read More »

Passivation and Cleaning Procedure Purified Water Distribution Loop

Objective : To ensure that the Purified Water Distribution System is Chemically cleaned. Scope :Applicable for Passivation and Cleaning of Purified Water Distribution Loop Procedure : Fill the Purified Water Storage Tank till the Half Level.  Ensure Suction & Discharge valve of pump are open and all user points & sampling …

Read More »

Slope Verification Procedure for Purified Water Distribution System

Slope Verification Procedure for Purified Water Distribution System Objective : To ensure that the distribution lines are sloped towards the point of use and slope of the lines is approximately 1mm in 100 mm. Scope :Applicable for Slope Verification of Purified Water Distribution System Procedure Collect the As Built Isometric Drawing …

Read More »

Boroscopy Examination Procedure for Purified water system

Objective : To take the photographs of pipe weld joints made by fusion of base material without the addition of filler and recorded in the attached compact disc and should meeting the required specifications mentioned below.  Uniformity in weld joint. Should have proper penetration. Should not have any foreign object …

Read More »

Orbital Welding Procedure for purified water system

Orbital Welding Procedure for purified water system Objective : To get more consistent root weld beads and weld overrun, pinholes should be absent. Scope :This SOP is applicable for Orbital Welding of purified water system Procedure : Ensure the welder is qualified before starting of welding. Clamp the welding head at …

Read More »

Hot Water Sanitization Procedure of Purified Water Distribution Loop

Hot Water Sanitization Procedure of Purified Water Distribution Loop Objective : To ensure that the Purified Water Distribution Loop along with the tank is sanitized at 85 degree Centigrade to reduce the microbial count. Scope : Procedure : Fill the Purified Water Storage Tank till the Half Level. Ensure Suction …

Read More »

Dead Leg for Purified Water Storage & Distribution System

Dead Leg for Purified Water Storage & Distribution System A dead leg within a water distribution system denotes a segment of piping that is no longer actively utilized. It has the potential to foster microbial contamination, thereby posing a risk to the overall quality of the water. Dead legs may …

Read More »

Operational qualification purified water generation system

Operational qualification purified water generation system The purpose of this protocol (OQ protocol) is to establish confidence that the Purified Water Generation System is capable of operating within these established limits and tolerances with following feature but not limited to: The functional design specification to be address the permanent recording, …

Read More »

Protocol for perfomance qualification of water for injection generation, storage and distribution system

Protocol for perfomance qualification of water for injection generation, storage and distribution system Objective: To establish the methodology for the Performance Qualification of WFI Generation, Storage and Distribution system , which produces pyrogen free, water for injection, used as a Sterile products manufacturing facility. Purpose and Scope The purpose of …

Read More »

SOP for sterilization of media.

SOP for sterilization of media. Objective: To lay down a procedure for sterilization of media. Scope: This SOP is applicable for sterilization of media. Responsibility: Production Officers / Executive shall be responsible for follow the procedure mentioned in this SOP. Accountability: Production Head and QA Head shall be accountable for …

Read More »

SOP for Cleaning and Sanitization of Drain Point.

SOP for Cleaning and Sanitization of Drain Point. Objective: To lay down a procedure for cleaning and sanitization of drain point. Scope: This SOP is applicable for cleaning and sanitization of drain point. Responsibility: Production Officers / Executive shall be responsible for follow the procedure mentioned in this SOP. Accountability: …

Read More »

SOP on Steps to be taken in case of Environmental Failure

Objective To lay down the steps to be taken in case of environment failure in the aseptic area of Sterile Dry Powder Injectables facility. Scopе This SOP describes the steps to be taken in case of environmental failure. Responsibility Production Officers / Executive shall be responsible for follow the procedure …

Read More »

SOP on Destruction And Disposal of Media Filled Vials

SOP on Destruction And Disposal of Media Filled Vials Objective: To lay down a procedure on destruction and disposal of media filled vials. Scope This SOP is applicable for destruction and disposal of media filled vials. Responsibility Production officer / Executive shall be responsible for follow the procedure mentined in …

Read More »