Tag Archives: Ujjain

Procedure for Operation & Cleaning of Mass Mixer

Procedure for Operation & Cleaning of Mass Mixer 1.0       OBJECTIVE:             To Lay Down the Procedure for Operation & Cleaning of Mass Mixer. 2.0       SCOPE:             This SOP is applicable for production Department for Operation & Cleaning of Mass Mixer            3.0       RESPONSIBILITY: 3.1       Officer production & …

Read More »

Operation & Cleaning of Laser Printing Machine

Operation & Cleaning of Laser Printing Machine 1.0       OBJECTIVE:             To Lay Down the  Procedure for Operation & Cleaning of Laser Printing Machine. 2.0       SCOPE: This SOP is applicable for production Department for Operation & Cleaning of Laser Printing Machine   3.0       RESPONSIBILITY: 3.1       Officer production …

Read More »

Operation & Cleaning of Induction Sealing Machine

Operation & Cleaning of Induction Sealing Machine 1      OBJECTIVE: To Lay Down the  Procedure for Operation & Cleaning of Induction Sealing Machine. 2.0       SCOPE: This SOP is applicable for production  Department for Operation & Cleaning of Induction Sealing Machine   3.0       RESPONSIBILITY: 3.1       Officer production …

Read More »

Calibration procedure for tap density apparatus [Make- electro Lab]. Quality assurance

OBJECTIVE To lay down the procedure for Calibration of Tap density apparatus, Make – Electro lab. SCOPE This SOP shall provide the Calibration procedure of Tap density apparatus of quality control department. RESPONSIBILITY Officer/ Executive – Quality Control ACCOUNTABILITY Head QC/QA PROCEDURE Before starting the operation check for the area …

Read More »

Procedure for operation and calibration of IR Spectro Photometer (SHIMADZU). Quality assurance

OBJECTIVE To lay down the procedure for operation and calibration of Fourier Transform Infrared Spectrophotometer (Shimadzu) SCOPE This SOP shall be applicable for Quality Control in Quality Assurance department. RESPONSIBILITY Quality Control Executive/Officer. ACCOUNTABILITY Head Quality Control. PROCEDURE FOR CLEANING Check that the power supply to the instrument is switched …

Read More »

Procedure for calibration of conductivity meter (PICO)

OBJECTIVE To lay down the procedure for calibration of pH / CONDUCTIVITY METER (PICO) SCOPE This Standard Operating Procedure (SOP) is applicable for pH meter (PICO).  RESPONSIBILITY Quality Control Executive / Officer. ACCOUNTABILITY Quality Control   Manager PROCEDURE Operate the Instrument as per procedure no.   BA(II)QA217 Calibrate the instrument by preparing …

Read More »

Checklist in Quality control for Audit Preparation of FDA & USFDA

Checklist in Quality control for Audit Preparation of FDA & USFDA Personnel Organogram of Quality control departments List of Employee and education details Individual Job Description Training Record of Individual employee as per   individual Job Responsibility  and Training Log and training assessments records Analyst Qualification records as per  individual Job Responsibility and  …

Read More »

Calibration of KARL FISCHER (METTLER TOLEDO)

OBJECTIVE To lay down the procedure for CALIBRATION of KARL FISCHER (METTLER TOLEDO) SCOPE To ensure that the instrument performs satisfactory and gives accurate and reproducible data. This SOP shall be applicable for the KARL FISCHER APPARATUS (METTLER TOLEDO). RESPONSIBILITY Quality Control Executive/Officer. ACCOUNTABILITY Quality Control Manager. PROCEDURE FOR CLEANING …

Read More »

LINE CLEARANCE CHECKLIST FOR VACUUM CLEANER

LINE CLEARANCE CHECKLIST FOR VACUUM CLEANER Dosage Form: Date / Time: Product: Batch No.  : Previous Product: Batch No.  : Vacuum cleaner ID No.: Stage areas / room & equipment Checks Checked by Production Date & Time Counter checked By Quality Assurance Date & Time Vacuum cleaner Equipment ID No.: …

Read More »

Calibration procedure for friability test apparatus

OBJECTIVE To lay down a procedure for Calibration of Friability Test Apparatus to give accurate and reproducible data. SCOPE This Standard Operating Procedure (SOP) is applicable to In process samples. RESPONSIBILITY IPQA / Production Executive / Officer  ACCOUNTABILITY Head–Quality Assurance PROCEDURE Operate the Friability test apparatus as per SOP No.  …

Read More »

Calibration procedure for disintegration test apparatus (ED-2AL)

OBJECTIVE To lay down a procedure for Calibration of Disintegration test apparatus SCOPE This Standard Operating Procedure (SOP) is applicable to DT apparatus placed in IPQC lab and in Quality Control. RESPONSIBILITY IPQA / Production Executive / Officer  ACCOUNTABILITY Head–Quality Assurance PROCEDURE Check the water level in the water bath. …

Read More »

Procedure for operation of weighing balance (Make: METTLER TOLEDO)

OBJECTIVE To lay down a procedure for Operation of weighing balance PB-303S. SCOPE This Standard Operating Procedure (SOP) shall be applicable for weighing balances installed in sampling booth. RESPONSIBILITYQuality Control Officer / Executive ACCOUNTABILITY Head – Quality Assurance\ PROCEDURE On/off switching Press < IB> key briefly. The balance performs a …

Read More »

LINE CLEARANCE CHECKLIST OF AREA & EQUIPMENT FOR PACKING LINE

LINE CLEARANCE CHECKLIST OF AREA & EQUIPMENT FOR PACKING LINE Dosage Form: Date / Time: Product: Batch No.  : Previous product: Batch No.  :       Stage areas / Equipment Name Checks Checked by Production Date & Time Counter checked By Quality Assurance Date & Time PACKING [Released / …

Read More »

BATCH MANUFACTURING RECORD (BMR)

BATCH MANUFACTURING RECORD (BMR)  TABLE OF CONTENT GENERAL PROCESSING INSTRUCTION LIST OF EQUIPMENT USED DISPENSING OF RAW MATERIAL GRANULATION COMPRESSION COATING TABLET INSPECTION DOCUMENT RECONCILIATION BMR REVIEW BATCH RELEASE 1.0 GENERAL PROCESSING INSTRUCTION All the Activities shall be performed as per current SOPs. Follow GMP compliance throughout the manufacturing process. …

Read More »

BATCH PACKING RECORD (BPR)

BATCH PACKING RECORD (BPR) BATCH PACKING RECORD (BPR) BMR Title : BPR for Tablet Document No. : Batch Size :   Page No. :  1 of 15  Effective Date :   Review Date : Product Name                         :   Generic Name                         :   Labels Claim)                         : Each _____________________________________ …

Read More »

Procedure for operation of pH / CONDUCTIVITY METTLER (PICO)

OBJECTIVE To lay down the procedure for operation of pH / Conductivity meter (PICO) SCOPE To ensure that the instrument performs satisfactory and gives accurate and reproducible data. This SOP shall be applicable for the pH / Conductivity meter (PICO). RESPONSIBILITY Quality Control Executive/Officer ACCOUNTABILITY Quality Control Manager. PROCEDURE PROCEDURE …

Read More »

Operating procedure for milli Q water system

OBJECTIVE To lay down the procedure for Operation of Milli Q water system, Make Millipore. SCOPE  This SOP shall provide the Operating procedure of Milli – Q water system of quality control department. RESPONSIBILITY  Officer/ Executive – Quality Control ACCOUNTABILITY Head QC/QA PROCEDURE OPERATION OF ELIX –10 Switch on Elix …

Read More »

Procedure for operation of SAS SUPER 100 AIR SAMPLER

OBJECTIVE To lay down a procedure for operation of SAS SUPER 100 Air sampler. SCOPE This SOP shall be applicable for viable air monitoring. RESPONSIBILITY Microbiologist ACCOUNTABILITY Head QC/QA PROCEDURE PRE START UP Remove the aspirating head. Insert an identified, closed contact plate and remove the lid of the plate. …

Read More »

Humidity Chamber

Humidity chamber The purpose of humidity chambers is to test the influence of varying environments on products to determine the length of their usefulness and at what point they will fail. The collected data assists engineers in adjusting their designs and selecting more resilient materials. Humidity chambers play a crucial …

Read More »

Operating procedure for ultrasonic bath

Operating procedure for ultrasonic bath. Quality assurance OBJECTIVE To lay down a procedure for operation and cleaning of ultra sonic bath SCOPE This SOP shall be applicable for operation and cleaning of Ultra sonic bath. RESPONSIBILITY Quality Control Executive/Officer ACCOUNTABILITY Head-Quality Control. PROCEDURE  FOR CLEANING Switch OFF the equipment and …

Read More »