SOP on In process Checks by IPQA
Objective : To lay down a procedure for carrying In-process checks by IPQA personnel.
Scope : This standard operating procedure is applicable at formulation plant of Panacea Biotec Limited, Baddi.
Responsibility
Officer /Executive IPQA shall be responsible to perform in-process checks as per this SOP.
Head – QA or designee: To ensure the compliance of this SOP.
Procedure
IPQA personnel shall perform the in-process checks during the manufacturing and packaging operations as per respective BMRs.
Frequency of in-process checks by IPQA personnel shall be at least twice in a shift / and at starting of a new batch.
In-process check sheet shall be part of BMR.
Training Evaluation Questionnaire
- Who is responsible for performing in-process checks during manufacturing? IPQA /Stores/Production/QC.
- Is in-process check sheet is a part of BMR? True / False .
- Who is responsible for the compliance of this SOP? Head-Production /Head-QA /Head-QC /None of these.
- What is the frequency of checks? Once /At starting of new batch /Twice in shift.