Compression Machine – Qualification

Compression Machine – Qualification (Operational)

Compression Machine – Qualification (Operational) (OQ) involves identifying and inspecting equipment features that can impact final product quality Operational qualification is the next step in quality assurance and involves testing the equipment and making sure it performs as specified, within operating ranges as listed by the manufacturer. All aspects of the equipment receive individual testing and the tester documents the proper operation of each. Compression Machine – Qualification (Operational) (OQ) for equipment is necessary after installation, significant maintenance, or modifications to the equipment, or as a feature of scheduled quality assurance testing. Operational qualification aspects that will be tested may include leveling and fluctuation, repeatability, keyboard controls, deviation reports, calibration, and certificates, as well as performance reports.

Table of Contents Compression Machine – Qualification

  • Purpose
  • Scope
  • Responsibilities
  • Procedure
  • Operational qualification tests
    • Main Panel / Control Panel Testing
    • Power & Communication Failure Recovery Verification
    • Safety Features Verification
    • Variable RPM verification
    • Operational Qualification Tests Status
  • List of Standard Operating Procedures
  • Data Analysis, Summary of OQ & Recommendations
  • Amendment record
  • Conclusion

PURPOSE

To describe the Operational Qualification procedure to be used during the qualification of 16- Station Single Rotary Tablet Compression Machine, its accessories and to define the specification of the system in order to:

  • Ensure that the equipment meets the Operational/Design limits as per user requirements.
  • Ensure that the equipment will be operationally qualified in accordance with current Good Manufacturing Practices.

SCOPE

This procedure applies to the Operational qualification of 16- Station Single Rotary Tablet Compression Machine and its accessories to be installed.

RESPONSIBILITIES

  • It is the responsibility of the Manufacturer to prepare the Operational qualification protocol.
  • It is the responsibility of the client to check and approve the Operational qualification protocol.
  • It is the responsibility of the Manufacturer to perform all the tests with respect to Operational qualification and compiling data in co-ordination with client. 

PROCEDURE

The following requirement  apply to 16- Station Single Rotary Tablet Compression Machine Operational Qualification activities:

  • To verify the components design parameters.
  • Review the preventive maintenance procedures, cleaning procedures and general operational procedure to ensure that they are comprehensive for reliable performance of the equipment. 

PERFORMANCE QUALIFICATION FOR TABLET COMPRESSION

  • OPERATIONAL QUALIFICATION TESTS

The table below lists the tests to be performed as part of the Operational Qualification phase.

Main Panel  / Control Panel Testing

Power & Communication Failure Recovery Verification

Safety Features Verification

Variable RPM verification

Main Panel / Control Panel Testing

Purpose –

To verify that the response of the equipment at the input from various Push button / Switches on control or main panel.

Test equipment –

None Required.

Procedure –

Give inputs from various Push buttons & Switches on Control Panel / Main Panel.

Acceptance Criteria –

The equipment will respond as mentioned in the target column of the table given below.

Take dry run of the equipment to ensure that all controlling parameters &functions are reproducible.

Test Results

Main Panels ON/OFF switch switched ON – Clutch Disengage and main Drive motor STOP push button shall glow up. Counter screen shall start.

Press main drive start push button – Main motor shall start running. drive start push button shall glow up, drive stop push button shall turn OFF and reading on ampere meter shall increase.

Press clutch engage push button – Turret shall start rotating. Green push button for clutch shall glow up, red push button for clutch shall turn OFF and reading on ampere meter shall increase.

Rotate the rotary knob clockwise and anticlockwise – On rotating knob clockwise turret RPM shall increase and on rotating anticlockwise turret RPM shall decrease.

Insert the key in lock on screen and turn it to green indicator – Screen shall display the reading

Turn the rotary button on screen to RPM mode – Screen shall show the turret RPM

Turn the rotary button on screen to Count mode – Screen shall display the total tablet count.

Turn the rotary button on screen to PRODUCT RATE mode – Screen shall display the tablet compressed per min.

Disengage the clutch by pressing red push button – Turret shall stop rotating. Green push button for clutch shall turn off, red push button for clutch shall glow up and reading on ampere meter shall decrease.

Press main drive stop push button – Main motor shall stop running. drive stop push button shall turn ON, drive start push button shall glow up and reading on ampere meter shall decrease to zero.

Turn Safety Guard Interlock rotary button to Bypass position – Safety Guard Interlock rotary button shall glow up

Turn Safety Guard Interlock rotary button to Interlock Position – Safety Guard Interlock rotary button shall turn OFF

Power & Communication Failure Recovery Verification

Rationale –

To verify that in the event of a power loss or communications failure, the equipment will stop in safe condition.

Test equipment –

None Required.

Procedure for Power and Communication Failure Recovery test –

Operate the equipment in automatic mode or as directed in the User Manual.

While the equipment is operating, shut down the power to the main control panel. Record if the equipment stops in a safe and secure condition.

Wait for 5 minutes then restore power to the equipment.

Check whether system is start running once the power is restored

The system is not starting of its own, restart the equipment. Record whether the equipment starts normally, and note any adverse condition.           

Acceptance criteria –

The equipment shall stop in safe and secure condition.

The equipment should not start of its own after the power is restored without user permission

The equipment shall restart normally, with no problems or adverse conditions.

Power and Communication Failure Recovery test results

Main Power Shut Down : Equipment stops in a safe and secure condition.

Main Power Restored :Equipment is not starting of its own without user permission ,Equipment can be restarted with NO problems

Safety Feature Verification           

Purpose –

To avoid damage to the operator or property while operating the equipment.

Test equipment –

None Required.

Procedure –

Operate the equipment as mentioned in the tabular column.

Acceptance Criteria –

The equipment shall respond as mentioned in the target column of the table given below.

Fail safe Results –

Start the machine as per the operational manual and press emergency switch and try to start the machine – Equipment shall not start when emergency switch is pressed and it shall not start until emergency push button is released

Release the Emergency push button and start the machine. – Machine shall start after releasing the Emergency push button.

Turn the safety Guard Interlock rotary button to the INTERLOCK position and open the safety cover. Close the safety door and start the machine. Repeat this for all four doors. –

Machine shall stop when safety door is open ,Machine shall start when safety door is properly closed.

Variable RPM verification

Purpose –

To check the RPM of turret as per RPM observe at the counter screen.

Test equipment –

Digital Tachometer.

Procedure –

Start the equipment as per operational manual.

observe the RPM of the turret with digital tachometer. Repeat process for three times.

Rotate the rotary knob to anticlockwise and clockwise and observe the RPM for both side rotations. Repeat process for three times.

Acceptance Criteria –

The RPM on screen and digital tachometer shall not vary more than 5%.

On anticlockwise rotation of the rotary knob turret RPM shall decrease and on clockwise rotation turret RPM shall increase. Both side average RPM on screen and digital tachometer shall not vary more than 5%.  

RPM Observed on the Counter Screen –The average RPM observed at Digital Tachometer shall not vary more than +/- 5% than that of the RPM observed at counter screen.

Actual No. of Revolution Observed – Trial-1 / Trial-2 /Trial-3 ,Ave. RPM

Note:

a) Enter the no of rotation for ‘1’ minutes in the trial –1, 2 & 3 columns.

b) Average RPM = (Trial-1 + Trial-2 + Trial-3) / 3

  Operational Qualification Tests Status

The table below lists the tests performed and related results.

  • Main Panel  / Control Panel Testing
  • Power & Communication Failure Recovery Verification
  • Safety Features Verification
  • Variable RPM verification

LIST OF STANDARD OPERATING PROCEDURES 

Operating Procedure of 16- Station Single Rotary Tablet Compression Machine.

Cleaning Procedure of 16- Station Single Rotary Tablet Compression Machine.

Preventive maintenance of 16- Station Single Rotary Tablet Compression Machine.

 Data Analysis, Summary of OQ & Recommendations

AMENDMENT RECORD

CONCLUSION

Pharma More Jobs and post Please click here

About Pharmaceutical Guidanace

Ms. Abha Maurya is the Author and founder of pharmaceutical guidance, he is a pharmaceutical Professional from India having more than 18 years of rich experience in pharmaceutical field. During his career, he work in quality assurance department with multinational company’s i.e Zydus Cadila Ltd, Unichem Laboratories Ltd, Indoco remedies Ltd, Panacea Biotec Ltd, Nectar life Science Ltd. During his experience, he face may regulatory Audit i.e. USFDA, MHRA, ANVISA, MCC, TGA, EU –GMP, WHO –Geneva, ISO 9001-2008 and many ROW Regularities Audit i.e.Uganda,Kenya, Tanzania, Zimbabwe. He is currently leading a regulatory pharmaceutical company as a head Quality. You can join him by Email, Facebook, Google+, Twitter and YouTube

Check Also

Unlocking Success with User Requirement Specification: Coating Machine URS

Unlocking Success with User Requirement Specification: Coating Machine URS In any project or system development, …