- Objective:
- To lay down the procedure for Fogging of Microbiology Testing Areas
- Scope:
- This SOP is applicable for Fogging of Microbiology Testing Areas in Microbiology Laboratory.
- Responsibility:
- Chemist or above of Microbiology Laboratory:
- Head – Microbiology section.
- Accountability:
- Head – Quality Control.
- Procedure:
- Operation
- Perform the Fogging of Microbiology once in a week at the end of working hours
- Perform the fogging on below mentioned areas on different days Sterility testing area.
- MLT, Subculture room and MLT section corridor and Change room.
- Operation
3) Sterilization area
- Make sure that the area is thoroughly cleaned before fogging.
- Close all the dampers.
- Switch off all the AHU.
- Enter into the area to be fogged as per the SOP along with the fogger (Micromist and Nanotech) filled with the required quantity of dilute disinfectant.
- Sterility testing area:
- Switch off the interlocking of the sterility testing area.
- Enter into change room-4 as per the SOP for the area along with the fogger filled with dilute virosil.
- Keep the doors between change room-2 & 3 and change room 3 & 4 open.
- Place the fogger in one corner of change room-4.
- Adjust the motor angle at 45˚C and the timer to 0.5 liter.
- Connect the power cord of the fogger to the mains and switch on the fogger and quickly move out of the room into the sterility room and close the door.
- Wait in the sterility room for the fogging to complete.
- As soon as the fogging is complete, quickly transfer the fogger from change room-4 to Sterile Buffer room and place similarly.
- Adjust the timer to around 0.7 liter.
- Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the sterility test room.
- Wait for the fogging to complete.
- As soon as the fogging is complete, quickly transfer the fogger from Sterile Buffer room to Sterility test room and place it similarly.
- Adjust the timer to around 0.7 liter.
- Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the Return Buffer room and close the door.
- As soon as the fogging is complete remove the fogger from the sterility test room and then place the fogger in change room-1.
- Keep the doors between Return buffer & Return A/L and Return A/L & Change room-1 open.
- Connect the fogger power cord to the mains and switch on the mains and quickly move out of the room into the Microbiology corridor and close the door.
- Place a tag “Area Under Fogging” on the entry door and leave the area undisturbed for overnight.
- MLT Section:
- Switch off the AHU of the MLT Section.
- Enter into the MLT Section as per the entry SOP along with the fogger.
- Enter the Subculture room and place the fogger in one corner on a SS stool and connect the power cord of the fogger to the mains.
- Adjust the timer of the fogger to 0.5 liter and switch on the mains.
- Quickly move out of the room, close the door properly and wait in the change room till the fogging is completed.
- As soon as the fogging is completed quickly take the fogger out of the subculture room and then fog the MLT room using the same procedure.
- After the fogging is complete in the MLT room quickly take out the fogger from the
MLT room and place it in one corner of the change room on a SS stool.
- Adjust the motor angle at 45˚C and the timer to 1.0 liter.
- Connect the power cord of the fogger to the mains and switch on the mains and quickly move out of MLT section.
- Place a tag “Area Under Fogging” on the entry door and leave the area undisturbed for overnight.
- Sterilization area:
- Switch off the AHU of the Sterilization area.
- Enter into the Sterilization area as per the entry SOP along with the fogger.
- Enter the Media decontamination room and place the fogger in one corner on a SS stool and connect the power cord of the fogger to the mains.
- Adjust the motor angle at 45˚C and the timer to 0.5 liter.
- Switch on the mains and quickly move out of the room.
- As soon as the fogging is completed quickly take the fogger out of the Media decontamination room and then fog the Media preparation room, following the same procedure.
- After the fogging of the Media preparation room, quickly take out the fogger and place in one corner of the sterilization room on a SS stool.
- Adjust the motor angle at 45˚C and the timer to 1.0 liter.
- Switch on the mains and quickly move out of the room.
- Place a tag “Area Under Fogging” on the entry door and leave the area undisturbed for overnight.
- Dilute and use required volume of Virosil as per Table-I.
- Pour the prepared disinfectant solution in to the tank of fogger prior to entering the area to be fumigated.
- Operate the fogger as per SOP.
- Come out of the room using exit process of the particular area.
- Put the label as ‘Area Under Fogging’. Keep the area under this condition for over night.
- In the next day morning, switch on the AHU. Open the dampers.
- Enter the area as per respective entry procedure. Close all the doors. Remove the Fogging set and exit along with the set.
- Record the fogging details.
Table-I. Dilution and Use Volume of Virosil
Name of the Area | Name of Fogging
Solution |
Volume of fogging
Solution Concentrate. (ml) |
Volume of WFI/ PW (ml) | Total Volume
(ml) |
Sterility Testing room | Virosil | 150 | 600 | 750 |
Sterile Buffer room | Virosil
|
150 | 600 | 750 |
Change rooms-2, Change room-3 and Change room-4 | Virosil
|
100 | 400 | 500 |
Return Buffer, Return A/L and Change room-1 | Virosil | 100 | 400 | 500 |
Sub-culture room | Virosil | 100 | 400 | 500 |
MLT room | Virosil | 100 | 400 | 500 |
MLT A/L and Change room | Virosil | 200 | 800 | 1000 |
Media decontamination room | Virosil | 100 | 400 | 500 |
Media preparation room | Virosil | 100 | 400 | 500 |
Sterilization area and Washing area | Virosil | 200 | 800 | 1000 |
- List of Annexure / Formats
- Fogging Record – Annexure – I
- References (if any):
- Fogger Manual
- Reason for Revision:
- Periodic review
- Abbreviations:
- SOP : Standard operating procedure
- No. : Number
- QC : Quality Control
- QA : Quality Assurance
- SS : Stainless Steel
- MLT : Microbial Limit Test
Annexure – I
Fogging Record
Area : _____________________
Date | Fogging
Sol. used |
Conc. | Volume | Volume of water | Total Volume | Done
By/ Time |
Remarks |