USER REQUIREMENT SPECIFICATION OF PRESSURE VESSEL
S. No | Table of Contents |
1 | General |
2 | Salient Features |
3 | Operational requirements |
4 | Utilities |
5 | Maintenance |
6 | Documentation |
7 | Training |
8 | Packaging |
9 | Deviations |
10 | Delivery |
TECHNICAL
S. No. | Parameters | Requirement Specifications |
1
1.1. |
GeneralEquipment No’s. |
|
1.2 |
Description |
|
1.3 |
Use |
|
1.4 |
Field Identification
|
To be installed in medicament preparation room in soft gelatin block.
(i) Room Temperature NMT 25ºC and RH NMT 60 % (ii) Non flame proof. |
1.5 | Glossary | |
2. |
Salient FeaturesGeneral |
|
2.1 |
Material of Construction |
All the contact parts preferably should be of SS 316L. |
2.2 | Finish | Internal / External – NLT 220/NLT 180 Grit. |
3. |
Operational requirements |
|
3.1 | Capacity | Working Capacity 150 Ltrs. |
3.2 | Control Parameter | Operational at the working pressure upto 1.0 kg. / cm2. |
4.
|
Utilities
|
To provide utilities at ONE POINT is user’s responsibility. Supplier to give details and drawings for exact size, location, type, capacity etc. of the utilities required. |
5.
|
Maintenance
|
Supplier should provide (at minimum) the following maintenance instructions,
· Daily checks on machine · Cleaning procedures |
6. | Documentation
|
· Layout drawings.
· MOC certificates. · Vendor’s QA certificates at the time of delivery. |
7.
7.1 |
Training
Start up support
|
Supplier to train the respective technical associates of Company on operation, maintenance and cleaning of the equipment wherever applicable. |
7.2 |
Post start up support |
Telephone / Fax / E mail ID / Address
Replacement parts availability list (normal lead times shall be listed). |
8. | Packaging | Shall be describe about shipment packing |
9. | Deviations | Any deviation from URS shall be highlighted. |
10. | Delivery | Company Address |