MAINTENANCE OF INGERSOLL RAND AIR COMPRESSOR, MODEL IHE-5-NL-2

  • OBJECTIVE         
  • To lay down a procedure for Maintenance of Air compressor
  • SCOPE
  • This SOP is applicable to Air compressor.
  • RESPONSIBILITY
  • Technical Supervisor / Engineer       
  • ACCOUNTABILITY
  • Sr.Executive / Manager                    
  • PROCEDURE
  • Daily Maintenance
  • Check and ensure oil level as per the mark given on the view glass.
  • Clean the outer surface of the Air compressor, motor and all pipelines.
  • Check and ensure loading and unloading of the compressor w.r.t pressure Limit 7.5 kg/ sq cm loading –8 kg/sq cm unloading.
  • Open the drain valve to drain the condensed water.
  • Check and ensure cooling water pressure and temperature of inlet should be within limits. (Pressure range from 1.5 to 2.8 kg/cm² & temperature range from 26º C – 35º C)
  • Check and ensure lubrication oil pressures 1.1 to 2.8 kg/cm²
  • Check and ensure discharge air pressure is in between 7.5 to 8.0 kg/cm²
  • Check and ensure discharge air temperature should be between 110ºC to 180º
  • Check the condition of belts.
  • Put a Tick mark (Ö) in Daily Check Sheet  after completion of each activity. If it is not O.K put a cross (X) in Daily Check Sheet indicating the reason in remarks column.
  • Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
  • Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its compliance there of.
  • Weekly Maintenance               
  • Clean and reset the auxiliary valve with Cora cloth.
  • Clean the bowl air filter element with Cora cloth and air.
  • Clean the air intake filter with compressed air and Cora cloth.
  • Clean the oil breather with Cora cloth.
  • Check and ensure the air compressor load is below 60 Amps during unloading and below160 Amps during loading.
  • Blow off oil from Low pressure and High-pressure side of the crankcase.
  • Check and ensure no air leakages in the system.
  • Put a Tick mark in Weekly Check Sheet .
  • Monthly Maintenance
  • Check and tighten the motor Bed Bolts if it is loose.
  • Clean the contactor kits with carbon tetra chloride.
  • Clean the auxiliary valve inside by EMERY paper.
  • Open the motor terminal covers and tighten the terminals, replace terminal strip if terminals are broken.
  • Clean the control panel with air blower and ensure no control wires should hang, tag the wires with cable tag if it is hanging.
  • Put a Tick mark  in Monthly Check Sheet.
  • Quarterly Maintenance    
  • Do the alignment of the motor pulley and compressor pulley.
  • Regrease the motor Bearings.
  • Clean the inlet and discharge valves and replace if worn out or damaged.
  • Check and ensure connecting Rod Bearing side clearance not to exceed 0.002mm.
  • Change 20micron filter, if pressure drop exceeds 20 PSI.
  • Put a Tick mark  in Quarterly Check Sheet.
  • Half Yearly Maintenance    
  • Calibrate the pressures and Temperature gauges. Of Inlet and Outlet.
  • Calibrate the pressure switches.
  • Check and clean the contactors, replace the contactor kits if it is damaged.
  • Air inlet filter element to be replaced if necessary.
  • Put a Tick mark in Half Yearly Check Sheet .
  • Yearly Maintenance
  • Lubricate the pedestal bearings.
  • Check piston ring and rider band axial clearance not exceed 0.0254 mm.
  • Check and ensure the X-HD share clearance not to exceed 0.0025 mm
  • Check and ensure no vibration of driven pulley.
  • Calibrate the safety valve. Temperature and pressure gauges.
  • Check crankshaft thrust and replace if it is worn out.
  • Check the working condition of soft starter; do the servicing if it not functioning.
  • Check the working condition of contactor, replace if it is chattering.
  • Put a Tick mark  in Yearly Check Sheet.
  • Forms and Records (Annexures)
  • Not Applicable
  • Distribution
  • Master copy –  Quality Assurance
  • Controlled copies- Quality Assurance, Production, Quality Control
  • History
    Date Revision Number
    Reason for Revision

     

    00 New SOP

     

 

 

About Pharma Editor

Check Also

Operational qualification protocol cum report

Operational qualification protocol cum report shall consist of minimum contents but not limited to. Overview …

error: Content is protected !!