- OBJECTIVE
- To lay down a procedure for Maintenance of Bore well Pump
- SCOPE
- This SOP is applicable to bore well Pump
- RESPONSIBILITY
- Technical Supervisor / Engineer
- ACCOUNTABILITY
- Sr.Executive / Manager
- PROCEDURE
- Monthly Maintenance
- Clean the contactors with CTC / CRC
- Ensure the pump load should be in between 7.5-10 Amps
- Ensure no water leakages from pipe lines.
- Ensure cable glands are tight.
- Ensure the earthing, which is connected to the pump, should also be connected to earth grid by checking with earth megger.
- Clean the control panel with air blower.
- Put a Tick mark in Monthly Check Sheet after completion of each activity. If it is not O.K put a cross (X) in Monthly Check Sheet indicating the reason in remarks column.
- Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
- Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its complaints there of.
- Yearly Maintenance
- Check the valve function by opening & closing and ensure the water is flowing through the valve during open condition and water should not flow during closing condition.
- Overhaul the pump.
- Put a Tick mark in Yearly Check Sheet and repeat the above mentioned procedure.
- Forms and Records (Annexures)
- Not Applicable
- Distribution
- Master copy – Quality Assurance
- Controlled copies- Quality Assurance, Production, Quality Control
- History
Date Revision Number Reason for Revision
– 00 New SOP