IQ OF AUTOMATIC ROTARY TYPE MEASURING CUP PLACEMENT

IQ OF AUTOMATIC ROTARY TYPE MEASURING CUP PLACEMENT

Contents

  • Pre Execution Approval
  • Objective
  • Equipment Description
  • Participants Log
  • Installation Qualification Checklist
  • Sub-Component CheckList
  • Component Location List
  • MOC Verification List
  • Test / Inspection Reports
  • Utility Verification List
  • Attachment Log
  • Summary, Conclusion, and Recommendation
  • Abbreviations
  • Post Execution Approval

PRE-EXECUTION APPROVAL

Prepared by

By signing, the person is responsible for the accuracy of this Installation Qualification and agrees with the content

Approved by

The signature on this page indicates that this document has been reviewed, checked, and approved by the concerned person. It shall be signed and dated.

OBJECTIVE:

Installation Qualification protocol for Automatic Measuring Cup Placement Machine is written to comply with requirements for Qualification. Qualification of critical equipment is a GMP requirement.

Scope of Qualification:

The scope is limited to the Automatic Measuring Cup Placement Machine.

The purpose of this protocol is as follows:

  • To provide documented evidence that the Automatic Measuring Cup Placement Machine is installed as per design.
  • To collect the required information for installation of the Automatic Measuring Cup Placement Machine in order to assure the equipment functions as per the desired operating specifications.

EQUIPMENT DESCRIPTION:

Automatic Measuring Cup Placement Machine with cap feeding elevator is used put measuring cup on filled & sealed bottles to the subsequent machine for further operation.  It is capable of cap placement on 100-180 containers per minute.

Basic Constructional Features:

  • The Unit is compact, versatile, and enclosed in SS elegantly Hair finish body.
  • All non-contact parts shall be of SS304 / cladded with SS 304.

 Description:

  • The Main Motor on the gearbox.
  • C. frequency drive is provided for speed control.

PARTICIPANTS LOG:

All persons involved in the execution of this protocol must sign

INSTALLATION QUALIFICATION CHECKLIST:

Checks to be performed
Check for the Dimensional accuracy
Check for the receipt of the consignment in good condition
Check for the Motor and the Gearbox
Check for the alignment of the drive

The purpose of this checklist is to check and document the receipt of equipment and spares as per the Purchase order.

SUBCOMPONENT CHECKLIST:

Component (Make + Specs.) Observation
MAIN MOTOR

MAKE : BONFIGLIOLI

0.5HP/0.37KW/1.75A/230V/

1397RPM/3PHASE

SRNO.210580541540

CONVEYOR MOTOR

MAKE : BONFIGLIOLI

0.25HP/0.18KW/1.01A/230V/

1360RPM/3PHASE

SRNO.210380523543

MAIN GEAR BOX

MAKE : BONFIGLIOLI

MODEL : VF49 F128 P71 B5B3

SRNO.03 B03212856189

RATIO : 28:01

CONVEYOR GEAR BOX

MAKE : BONFIGLIOLI

MODEL : VF44 F120 P63 B5B3

SRNO.09 B03202500175

RATIO : 20:01

MAIN A.C DRIVE

MAKE : ALLEN BRADLEY

MODEL:22F-A2P5N103

SRNO.FA2P5NOW21030023

0.5HP/2.5A/230V/3PHASE

NO BOTTLE SENSOR

MAKE : WENGLOR

MODEL: P1KT002

TYPE: PHOTOELECTRIC

CONVEYOR A.C DRIVE

MAKE : ALLEN BRADLEY

MODEL : 22F-A2P5N103

SRNO.FA2P5NOW21140053

0.5HP/2.5A/230V/3PHASE

NO CAP SENSOR

MAKE : WENGLOR

MODEL:P1KT002

TYPE : PHOTO ELECTRIC

MCB-1

MAKE : SCHNEIDER

MODEL : A9N2P16C

TYPE : 2P-16A

MCB-2

MAKE : SCHNEIDER

MODEL : A9N2P20C

TYPE: 2P-20A

CONTACTOR-1

MAKE : SCHNEIDER

MODEL : LC1D09M7

TYPE : 09A

CONTACTOR-2

MAKE : SCHNEIDER

MODEL : LC1D12M7

TYPE : 12A

OLR

MAKE : SCHNEIDER

MODEL : LRD10

TYPE : 4 TO 6A

SMPS

MAKE: DELTA

MODEL:PMT24V150W2AA

SRNO.P62410AA020161885

TIMER

MAKE : EMTECH

MODEL:EPT 2400

RELAY

MODEL : 4-CHANNEL

CLUTCH SWITCH

MAKE : ESSEN

COMPONENT LOCATION LIST:

Component Location Observation
Main Motor Bottom of the Machine
Main gearbox Coupled to the main Motor

MOC VERIFICATION LIST: (REFERENCE TO CERTIFICATES):

Component MOC Observation
Machine frame structure                 M.S Angle powder coated  
Conveyor S.S.304  

TEST / INSPECTION REPORTS:

Documents Type
 Motor Test Certificate
Gear Box Test Certificate
A.C. Drive Test Certificate

UTILITY VERIFICATION LIST:

Utility Parameter Method  of Verification Acceptance Criteria
Electrical power supply By Multimeter Single Phase,220 to 240 V

ATTACHMENT LOG:

All documents attached to this protocol should be listed in the following log. If the attachment is more than one page then denote the number of pages along with the protocol number, signature, and date on the first page of the attachment.

SUMMARY, CONCLUSIONS, AND RECOMMENDATIONS:

Parameter Comment (Yes / No/NA)
Did the IQ Protocol comply with all the parameters laid down in the document?
Did the IQ invite any deviation?
In case of any deviation, is it ac

ABBREVIATIONS:

Abbreviation
Expanded Form
IQ Installation Qualification
NA Not Applicable
GMP Good Manufacturing Practice
SS Stainless Steel
RPM Revolution Per Minute
HP Horse Power
V Volts
Hz Hertz
A.C. Alternating Currant
MOC Material Of Construction

POST EXECUTION APPROVAL

Approver’s signature

Approver’s signature indicates all the test mentioned in Protocol has been completed and all the amendment and discrepancies are documented approved attached to the protocol. The signature in the below blocks indicates that the qualification report has been reviewed and found to an acceptable state and all the discrepancies have been satisfactorily resolved.

About Abha Maurya

Check Also

HVAC systems for non-sterile pharmaceutical as per WHO TRS. 937, 2006 ,Annex 2

HVAC systems for non-sterile pharmaceuticals as per WHO TRS. 937, 2006,Annex 2 Supplementary guidelines on …

error: Content is protected !!