MAINTENANCE OF RAW WATER DISTRIBUTION SYSTEM

  • OBJECTIVE           
  • To lay down a procedure for Maintenance of Raw Water Distribution System                
  • SCOPE
  • This SOP is applicable for Raw Water Distribution System.
  • RESPONSIBILITY
  • Technical Supervisor / Engineer       
  • ACCOUNTABILITY
  • Sr.Executive / Manager                    
  • PROCEDURE
  •  Monthly Maintenance
  • Check the motorized valves functioning of auto valves.
  • Check free rotation of auto valve manually.
  • Check and ensure no water leakages from valve glade and from any other flanges.
  • Check the indication lamps are working properly.
  • Ensure the functioning of flow meter with respect to flow.
  • Put a Tick mark (Ö) in Monthly Check Sheet after completion of each activity. If it is not O.K put a cross (X) in Monthly Check Sheet indicating the reason in remarks column.
  • Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
  • Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its complaints there of.
  •   Yearly Maintenance
  • Check and calibrate the Water totalisers
  • Check and repaint the pipelines, if required.
  • Check the water quality by sending to analysis.
  • Check and replace the damaged valves.
  • Put a Tick mark (Ö) in Yearly Check Sheet and repeat the steps as per 5.1.6, 5.1.7 & 5.1.8.
  • Forms and Records (Annexures)
  • Not Applicable
  • Distribution
  • Master copy –  Quality Assurance
  • Controlled copies- Quality Assurance, Production, Quality Control
  • History
    Date Revision Number Reason for Revision
    00 New SOP